Skip to content

Templates · checklist

Turnover quality standard (checklist)

A room-by-room definition of done you can hand to a new cleaner on day one, plus the photo checkpoints that keep quality from drifting.

Operations Practice4 min readfoundational

Key takeaways

  • Define the finished state, not the task list.
  • Four photos per turn is enough to see drift.
  • Trigger a full inspection after any maintenance visit or sub-5-star cleanliness mention.

Use this as the single source of truth for what "clean" means in your portfolio. Adapt the specifics; keep the structure.

Entry and living areas

  • Floors clear, no visible debris in corners or under furniture
  • All surfaces dust-free, including skirting, sills and light fittings
  • Remotes present, batteries working, staged in the same position every turn
  • Soft furnishings straightened to the reference photo

Kitchen

  • Fridge and freezer empty, wiped, no odour
  • Dishwasher empty and clean; no items left in drying rack
  • Consumables restocked to baseline (see template)
  • Bin emptied, liner replaced, exterior wiped

Bedrooms and bathrooms

  • Linen fresh, hospital corners, no hair on any surface — the single most reported failure
  • Under-bed and behind-door checks performed
  • Glass, mirrors and chrome streak-free
  • Towel set complete and folded to the reference photo

Photo checkpoints

  1. Arrival: property as found
  2. Any blocker, within 15 minutes of discovery
  3. Completion: kitchen, each bedroom, each bathroom, living area — same angles every time

Read the reasoning behind it

The full playbook covers SLAs, cost modelling and the inspection regime this checklist assumes.

Turnover quality standard

Checklist · includes:

  • Room-by-room definition of done
  • Photo checkpoint set (arrival, blockers, completion)
  • Blocker escalation rules and SLA targets
  • Inspection triggers and rolling sample guidance
  • Restock and consumables baseline

Operations Practice

Operations & maintenance

Turnover design, vendor management, preventive maintenance and the unglamorous systems that decide whether a portfolio scales.

Related reading

playbookOperations

Designing a turnover that survives scale

The turnover is the highest-frequency process you own. Here is how to design it so the twentieth unit runs like the first — including the failure modes nobody costs.

Operations Practice12 min

The Executive Brief

One decision-grade briefing, every Monday.

What moved in demand, cost and regulation last week — and the one call worth making because of it. No news roundups.